Project: BuckRV-8   -  
            Listing of Entries
    (Please mouse-over any icon to get a description of that function).



Categories
  
Builder Name:Buck Wyndham   -  
Project:   Vans - RV-8   -   VIEW REPORTS
Total Hours:3948.15
Start/Last Date:Jan 08, 2002 - No Finish Date
Engine:AeroSport Power IO-375-M1S
Propeller:Whirlwind 330-3B/72H-73 3-blade CS
Panel:G3X, G5, GTN650, GTR20, GTX45R, GMA245, GMC507
 
Friendly URL: https://eaabuilderslog.org?s=BuckRV-8

Home or Last Project Picture

Oct 23, 2008     Strobe pack mount - (1.0 hour) Category: Fuselage
I cut a second access hole in the wooden work floor that fits into the aft fuselage. This will allow me to install the strobe package in its new location, one bay forward of where it was originally going to be located. (This move was required by the magnetometer's requirement for 18" of space between it and any ferrous material or power supply.)

I measured between the longerons and cut up some scrap 1" angle. I'll rivet an angle on each longeron, and the existing mounting plate will be re-used.

[Superseded.]
 


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.